PRINTABLE PROJECT TOOL
Pool proposal comparison worksheet
Transfer differently formatted proposals into the same structure. Mark inclusions, exclusions, allowances, assumptions, and the person responsible.
Scope categoryProposal AProposal BProposal C
Design and site plan
Survey, engineering, and permits
Access, protection, excavation, and haulage
Structure or manufactured shell
Plumbing, circulation, and drainage
Pump, filter, sanitation, heating, and controls
Electrical, bonding, gas, and utility upgrades
Interior finish, tile, and coping
Decking, barriers, and landscape interfaces
Testing, start-up, training, warranties, and closeout